"Rhine Side" TT Layout - Project Plan Dave Harris & John O'Dell   2007, 08 & 09
This represents part of the German double track main line in the Rhine gorge (West bank), set in the DB post unification era (1994-2002), in European TT 1:120 scale. It consists of 3.0 metres of viewable scenery, a 3 m fiddle yard & 2 'side boards', forming an oval. The fiddle yard is arranged as 10 through sidings, 5 each in the North & South bound directions, plus 2 spur sidings from 1 of the main sidings.
Layout style: Double track oval, 3.5 m x 1.8 m overall size
Baseboards:  Light weight - mostly 6mm ply wood  x6
Traction Power control: Conventional 12v DC, limited to 9V   x2
Tracks: Tillig flexible & medium radius turnouts  x18
Turnout Motors: RC Servos with MERG electronics  x18
Layout Lighting: 48" fluorescent tubes  x2
Special Features: Overhead line equipment - Viessmann
Working colour light signals - Viessmann
Faller Car System
80 project tasks
Comp- lete? Primary Tasks Comp- lete? Parallel Tasks
100% sketch out draft designs 100% collect prototype photo file
100% draw up detail layout plans 100% draw up wiring plans
100% build 6 off baseboards 100% build legs to support only scenic boards 
100% build layout support structure 100% build transformer supply box
100% lay running lines, to near baseboard edges 100% procure servos & driver modules
100% lay 1 of each, north & south bound sidings 100% promo showing at CMRA Watford event
100% pin & wire tie-bars to fix routes 100% build 2 off control panels
100% build 5 off track power jumper leads 100% procure hand controllers
100% install track power wiring on boards 100% draw up tunnel portal plans
100% move everything to Alans garage 100% build 2 off tunnel portals
100% erect the entire layout and bracings 100% model basic landscape features in foam
100% lay tracks over baseboard edges 100% post promo stuff & video on You Tube
100% test running of trains 100% draw up 'restaurant' plans
100% 1st photo shoot 100% procure lighting components
100% pack up layout and move out of garage 100% lay all other fiddle yard sidings
100% erect scenic boards only, at Johns house  100% install frog micro switches & wire
100% paint rail sides rust 100% install turnout servo motors & wire
100% build tunnel area supports 100% install control wiring and jumper cable
100% test fitting of tunnel portals 50% install signal IR detectors & wiring
100% install masts, catenaries & tunnel ramps 100% build 'restaurant'
100% test running of loco with pantograph 100% build web site
100% remove masts & catenaries 100% write up stock running plan
100% install signal bases 100% procure stock transport boxes
100% paint inside of tunnel areas black 0% build back board
100% ballast scenic tracks 100% build lighting gantry
100% landscape over tunnel areas 100% make show information boards
100% build stone walls 10% make curtains
100% install Faller (FCS) roadway wires 100% procure CCTV kit
100% plaster skin over the basic landscape features    
100% install restaurant    
100% make & install lots of trees    
100% re-install masts & catenaries    
100% test running of locos with pantographs up    
100% pack up the layout    
0% mount back board on hinges    
50% install signals and wiring 33% draw up plans for FCS van/lorries
100% erect full layout back at the garage 20% build FCS lorry x3
100% full test running of the layout 100% build FCS turning circles
100% install lighting gantry 0% design & build Auto Train module
100% install overhead CCTV camera    
100% 2nd photo shoot    
100% pack up layout and move out of garage 20% promo article for publication
100% erect scenic boards only, at Johns house  100% Exhibition Managers layout guide
100% install shoreline detail & paint river 100% post promo stuff & video on You Tube
80% finish scenery